Area/Topic | Bibliography | Background | Hypotheses | Home |
KRIS Noyo : Chart Table Page
Area | Lower Noyo/Basin-wide |
Topic | Sediment: Matthew Road Construction by Period Basin Wide 1942-1999 |
Caption: The Chart Table RoadMiles42_99.dbf is the miles of road constructed (MILESROAD) in the Noyo River Basin as calculated from aerial photos and estimated from timber harvest permits (after 1985). The YEAR is the year of the aerial photo used for estimates so construction is for the period from prior aerials.
50 rows of a possible 60 have been displayed.
YEAR | MILESROAD |
---|---|
1942 | 58 |
1952 | 8 |
1957 | 104 |
1965 | 65 |
1978 | 142 |
1985 | 90 |
1999 | 288 |
www.krisweb.com |