Area/Topic  |  Bibliography   |  Background   |  Hypotheses   |  Home


 
 

KRIS Mattole River: Chart Table Page

Area Southern Mattole
Topic Timber Harvest: Percent Area Harvested, S. Mattole Subbasin 1983-2001

Caption:  The Chart Table THP_MAT_AMOUNT_SOUTH.DBF contains information on Timber Harvest Plans (THPs) permitted between 1983 and 2001 in each Calwater Planning Watershed in the Southern Mattole Subbasin. These data were compiled from records of THPs approved by the California Department of Forestry, but the plans were not necessarily implemented. ArcInfo was used to sum individual areas for each THP without subtracting for overlapping THPs. The data do not include harvest from plans approved in 1977-1982 yet delayed for up to five years. Click on the Picture Tab to see THP and digital orthophoto quadrangle images. Click on Info Links for more information. Key to Chart Table columns: PWS_NAME (= Calwater Planning Watershed), SHORT_NAME (= abbreviated name for Calwater Planning Watershed), SUBBASIN (= Mattole subbasin), PWS_NUM (= Calwater Planning Watershed number), CWP_ACRES (=total number of acres in Calwater Planning Watershed), CUT_ACRES (= total number of acres cut in Calwater Planning Watershed between 1983-2001), CUT_PCT (= percent area of the Calwater Planning Watershed that all THPs approved between 1983-2001 covered), ACRES_"year" (= acres of THPs approved in "year"), PCT_"year" (= percent area of the Calwater Planning Watershed that THPs approved in "year" cover), CUM_"year" (= cumulative percent area of the Calwater Planning Watershed that all THPs approved between 1983 and "year" covered).

 50 rows of a possible 126 have been displayed.
PWSNAMESHORT_NAMESUBBASINPWS_NUMPWS_ACRESCUT_ACRESCUT_PCTACRES_1983PCT_1983CUM_PCT_83ACRES_1984PCT_1984CUM_PCT_84ACRES_1985PCT_1985CUM_PCT_85ACRES_1986PCT_1986CUM_PCT_86ACRES_1987PCT_1987CUM_PCT_87ACRES_1988PCT_1988CUM_PCT_88ACRES_1989PCT_1989CUM_PCT_89ACRES_1990PCT_1990CUM_PCT_90ACRES_1991PCT_1991CUM_PCT_91ACRES_1992PCT_1992CUM_PCT_92ACRES_1993PCT_1993CUM_PCT_93ACRES_1994PCT_1994CUM_PCT_94ACRES_1995PCT_1995CUM_PCT_95ACRES_1996PCT_1996CUM_PCT_96ACRES_1997PCT_1997CUM_PCT_97ACRES_1998PCT_1998CUM_PCT_98ACRES_1999PCT_1999CUM_PCT_99ACRES_2000PCT_2000CUM_PCT_00ACRES_2001PCT_2001CUM_PCT_01
Bridge CreekBridge_CrSOUTH26102131765.2617.28000000000299.262.932.93260.032.555.48005.4832.840.325.855.950.556.350.60.016.35006.35006.35380.23.7210.070010.07455.124.4614.5312.110.1214.6517.380.1714.82109.851.0815.8919.610.1916.09122.31.217.28
Thompson CreekThmpsn_CrSOUTH277405.271939.2826.19000393.875.325.32005.32203.832.758.07008.0740.510.558.62288.753.912.52127.221.7214.24150.582.0316.2774.561.0117.28178.612.4119.690.830.0119.769.480.9420.64204.82.7723.4107.581.4524.860024.860024.860.810.0124.8797.841.3226.19



To learn more about this topic click Info Links .
To view a table of information about this data click Metadata .
To download the table with the chart's data, click thp_mat_amount_south.dbf (size 4,228 bytes) .
To view the table with the chart's source data, click Source Table web page.
To download the table with the chart's source data, click thp_mat_amount_source.dbf (size 23,862 bytes)
 
 
  www.krisweb.com